CAIRO, EGYPT
The Mantrac House is the first full project completed by ECAN. The project serves as Mantrac’s new Headquarters in the Cairo region, and is strategically situated within 15 mins from the New Administrative Capital. A state of the art water treatment plant was installed to treat the water used in equipment washing and general cleaning. The water is then recycled to be reused in washing, cleaning, and other general activities. Despite the difficulties that come with such a complex project, ECAN was able to deliver this project in only 15 months.
-
Project Components
The Project consists of 4000 m2 office building (4 floors), a 4500 m2 Warehouse, and a 2000 m2 Workshop
-
Project Budget
The project budget was in excess of 60 Million EGP
-
Project Duration
Turnkey project completed in 15 months
MANTRAC
ALEXANDRIA
ALEXANDRIA, EGYPT
ECAN is involved in the Firefighting System Retrofit project at the Mantrac Amreya Facility. This project had lots of complexities, as the facility is old (about 40 yrs old), with little to no architectural drawings, and a lot of missing information regarding the firefighting system. Despite the difficulties, ECAN was able to manage the contractor, and client, to help deliver this project.
- ECAN managed Project Controls
- ECAN updated the Firefighting System
MANTRAC
WAREHOUSE
ALEXANDRIA, EGYPT
Due to our client needs for new office space, our team came up with the idea of repurposing an old warehouse and turning it into office space. This was a favourable approach due to the difficulties of getting permits for a new building in the area.
-
Project Components
The Project consists of 1000 m2 of office space to house workstations, manager offices, meeting rooms, etc.
-
Project Data
Because of the height of the warehouse, we were able to create an above ceiling area to maintain all HVAC, Electrical, and Data systems
-
Project Duration
All targeted deadlines were met
MANTRAC
GHANA
TAKORADI, GHANA
ECAN was tasked to construct, and deliver 2 Office buildings, and a Lockers/Canteen building. The task was challenging as the delivery time was 12 month. ECAN was able to meet the target, and the official opening was attended by all management levels from Mantrac, and Caterpillar, including Mr. Lotfy Mansour, and The Vice President of Caterpillar.
-
Project Components
The Project consists of 2 Office buildings, and a Lockers/Canteen building
-
Project Budget
The project cost was around 6 Million USD
-
Project Duration
Turnkey project completed in 15 months
MANTRAC
MONROVIA
MONROVIA, LIBERIA
The new Mantrac Monrovia facility is currently considered the biggest construction project in Liberia (Dec 2019).
-
Project Components
The project consists of a 2000 m2 Office Building, an 840 m2 Warehouse, and an 800 m2 Workshop
-
Project Budget
The initial contractor winning bid for this project was around 15 Million USD. But as per the Client’s request, ECAN was able to apply several rounds of Value Engineering, and reduce the total cost to 9.4 Million USD, without sacrificing much in terms of functionality of the facility as a whole
-
Project Duration
The estimated delivery date is May 2021
MANTRAC
NIGERIA
ALARO CITY, NIGERIA
The new facility at Alaro City Freezone is considered a key project for our Client that will serve all of West Africa sites. ECAN had to finalize the design phase and tender phase in record time.
-
Project Components
The facility includes a Warehouse, Open Warehouse, a small Administrative Building, along with a large outdoor storing area for heavy equipment.
MANTRAC
RUSSIA
Yekaterinburg, Russia
The new facility at Yekaterinburg is another major undertaking for our Client to solidify its position in the Russian market. ECAN role is the Owner Representative and Key Decision Maker on this project. Consultancy is provided by a local consultant according to Russian Laws. The project is estimated to cost around 15 Million USD. It consists of a Showroom, Warehouse, Office Building, and a large Workshop. Due to the nature of the soils conditions at the project site, a total of 728 piles have to be driven for the foundation works, which is considered a major undertaking. Another challenge in this project is dealing with new laws and regulations, and extreme cold weather conditions.
-
Project Components
The project consists of a Showroom, Warehouse, Office Building, and a large Workshop
-
Project Budget
The project is estimated to cost around 15 Million USD
-
Project Duration
Still under Construction